FAQs

Frequently asked questions.

The questions that come up on nearly every project, plus longer notes on what changes between code cycles and what plan checkers actually flag.

A concrete and glass house at dusk, its full-height sliding doors folded back onto a lawn
FAQs2025 Energy Code · CALGreen · ECC/HERS
The basics

Start here

What is a Title 24 Compliance Report?

A Title 24 compliance report is the document that proves your design meets California's Building Energy Efficiency Standards, Part 6 of Title 24. It is built from your plan set: floor plans, the measured areas of every exterior wall, window and door, roof and floor assemblies, and the elevations that show which way each opening faces.

Those measurements go into CEC-approved software, and what comes out is the certificate of compliance: a CF1R for residential work, an NRCC for nonresidential, signed and sized to drop straight into the plan set you submit.

Why are Title 24 Compliance Reports needed?

Because the building department will not issue your permit without one. Any project that creates or alters conditioned space has to document its energy performance at the planning stage, and the compliance report is that documentation.

It keeps working after the permit, too. The report is the record that the building met the California Energy Commission's standards on the day it was approved, which matters at resale and any time the work is inspected or refinanced later.

Why choose Title 24 Master?

Every property type. Residential and commercial: homes, ADUs, additions, restaurants, hotels, gas stations, offices and retail.

Sustainable design and solar. Solar PV and battery sizing calculated to the 2025 requirements rather than bolted on afterwards.

Detail on every part of the project. Each wall, opening and assembly is accounted for individually, not averaged.

Modern architecture accommodated. Large glazing areas and unusual geometry are modelled on the performance path instead of being designed out.

Compliance in the right climate zone. All 16 California climate zones and all 58 counties, with the zone driving the design assumptions.

Swift approvals. Fast turnaround, and reports built to clear plan check the first time.

Ready when you are

Send the plans. Get a number the same day.

Fixed price before we start, five business days to signed forms, and plan-check corrections included for the life of the project.

Or call (909) 914-0305 and you'll get the engineer, not a receptionist.